Acceptance must read six standards for acceptance of new houses

Moving into a new home is not a big deal. There are many nuances that need to be taken care of. If you want to move in easily, you must also practice a variety of "Kung Fu." Profile picture

Winter acceptance is not too different from other seasons, so don't worry too much. In addition to choosing a formal decoration company for protection, Huang Shiming, manager of the engineering department of Dongyi Risheng Decoration Co., pointed out that water circuits, wall surfaces, ceilings, paints, wood and wood flooring have become the key projects for acceptance. There is a clear provision that can be obtained from the decoration company. At the same time, the owner has mastered these tips and can make acceptance more prepared and easy to deal with.

Water supply and drainage pipeline acceptance

1. The arrangement of pipelines should meet the design requirements. The installation of pipelines should be fixed firmly without looseness. The faucet and valves should be installed smoothly, with flexible opening, smooth water flow, and normal operation of the water meter. Acceptance by visual inspection and feel.

2. There should be no leakage at the joints between pipelines and appliances, pipelines and pipelines. Using the method of passing water, visually and feel the method to check for leakage.

3, the installation of water pipes shall not be close to the power supply, and the spacing between the water pipes and gas pipes shall not be less than 50mm. Check with a steel tape measure.

Electrical acceptance

1. After the completion of the project, the owner shall provide the dimension drawing of the line going to the position and carry out the acceptance inspection one by one according to the above requirements. The concealed electrical line shall be concealed after the acceptance of the owner.

2. The position of the live wire and the neutral wire facing the power socket is the right flame left-zero, and the socket with the grounding hole should be the upper position of the ground wire socket, and the grounding should be reliable. The switch socket should be firmly installed. Visual inspection and manual methods are used to check and special tools for circuit testing are used to verify that the positions of the live, neutral and ground wires on the socket meet the requirements.

Tile mosaic acceptance

1. The wall-inlaid stickers should be firm, the surface is smooth and clean, and no leaks are posted wrongly; the gaps are evenly distributed around the periphery, and the brick surface has no cracks, falling angles, missing edges, etc., and can be accepted by visual inspection under natural light.

2, with a small hammer gently tap on the wall to see if there is emptying phenomenon.

Wood products acceptance closet and hanging cabinet shape, structure and installation location should meet the design requirements. The framework should use a hoe structure (except blockboard). The surface should be smooth, there should be no burrs and hammer marks, when using veneer material, it should be flat and firm, no degumming, no corners at the corners. Cabinet doors should be securely installed, with flexible switches, and parallel to the lower port and the lower port of the film. The hardware is fully installed, firm, and in the correct position. It is checked by visual inspection and feel.

Villa design entrance decoration socket decoration decoration company switch decoration design floor tile tile adhesive floor tile tile picture

Garden Fence

Garden Fence,Dog Garden Fence,Removable Garden Fence

Iron Fence,Aluminum Fence Co., Ltd. , http://www.nbaluminumfence.com

This entry was posted in on