Home Collection: Summer Decoration Road can not be ignored

People who have renovated the house in the summer may find that after the renovation, there will be tiles falling off, wood deformation, and paint discoloration. The reason for this is mainly because the summer season is too hot and too dry and the rain is too moist and too wet.


Bai Ruijia curtain home     Minuo Sofa (Home of Origin)

So how can we avoid these problems? In summer decoration, every detail in the construction process should be noted, specifically in the following aspects:

Bricklayers make tiles more "drinking water"

In the summer, because the material is drier than normal, materials such as floor tiles and ceramic tile that need to be treated with swelled water must be treated for a prolonged period of time so that the water is nearly saturated. In this way, there will be no water absorption from the cement due to the drying of the tiles during the bonding process, so that the cement will not be firmly bonded, emptying or falling off, and will bring unnecessary trouble to the customer.

Electricians prevent short circuits from moisture

The electrical engineering in the renovation project is the most important thing, it is related to human life and property safety. In the summer decoration, attention should be paid to the standardization of circuit construction operations, especially in places where balconies and other places are prone to rain, and it is necessary to wrap copper wires exposed on the outside of the wires to prevent the wires from being short-circuited after being exposed to moisture. For the wires that surround the damp wood keels and joinery, this should be taken into account. If it is not careful, it is likely to cause fire.

Oil industry foundation construction is critical

In summer brushing oil, wall paints are prone to yellowing and peeling. Paints are prone to whitening and bubbles. These phenomena are caused by the dry and high humidity in the summer. Ms. Liu believes that this requires more work on the details and basis of construction.

In the wall base treatment, the ordinary putty can be changed into a waterproof putty, so that the adhesive between the paint and the base layer is stronger, it is not easy to fall off, and at the same time, the yellowing of the wall caused by the humidity can be avoided. In addition, pay attention to the number of scrapes and drying time when scraping the putty. Usually takes 1-3 times, during which the normal dry time is 1-2 days. However, in the rainy days when puttying, use a dry cloth to wipe off the wall vapour to keep the wall dry as much as possible. At the same time, according to the actual conditions of the weather, the time for putty drying should be extended as much as possible, generally 2-3 days is appropriate. In addition, putty is a project that requires a drying process. PuTTY does not dry out and will directly affect the subsequent painting of the coating. Therefore, it is also necessary to pay attention when arranging the construction period. Do not arrange this project too late. Grab the construction period and make this project sloppy and endless troubles.

Another point to remind you about oil works is that you should not paint as much as possible during rainy weather, because such weather paint is not easy to dry, affecting construction quality.

Supervision Tips: Teach you how to solve damp problems in the bathroom

Construction acceptance decoration company entrance decoration paint coating home home decoration cement cloth sofa balcony tile decoration home ld tile

Mirror Frames

Cornice And Moldng,Other Ceiling Co., Ltd. , http://www.nsceiling.com

This entry was posted in on