Second-hand housing and hydropower design 4 matters needing attention

1, shoddy materials used in some hidden projects shoddy, and the owner did not pay attention to the already completed, and even the owner of his home with what wires, what do not know the water pipes.
2. The material did not guarantee that on the day when the material came into the site, some decoration companies would send materials to the construction site according to the materials specified in the contract, and waited until the construction process. At the second feeding, the owners had relaxed their vigilance. At this time, It will mix some materials with the first one to mask customers.
3, process inconsistent In order to meet deadlines, or labor, some workers will often only deal with the effect of the large surface, and in some cabinet sides, wardrobe walls, drawers side, inside the door but the process is rough, do not even paint.
4. Some of the home improvement companies that designed the construction side did not determine the design plan before construction. During the construction, the construction side was designed so that the owner could not visually see the effect after the completion. The result was repeated demolition and rework, which not only destroyed the whole As a result, the construction period was delayed and the quality of the construction could not be guaranteed.
5. Malicious additions tend to lure customers with low prices first. After the construction starts, there will be additional money here and there will be additional money. Do not add it, they no longer work, plus it, as if a bottomless pit, more and more, riding a tiger.

Decoration design home decoration paint decoration find decoration company okay cabinet door drawer cabinet cupboard door

15FT

Putian Integrated Housing Co., Ltd. , http://www.zjprefabhouse.com

This entry was posted in on