For the owners, there is something to worry about. What's pleasing is that there is finally a house of reassurance that oneself belongs to. It is worrying that the acceptance of the house is very critical. If there is a problem during acceptance, it cannot be found. It is not mentioned with the developer. late. Because at that time developers will find all sorts of reasons to shirk or directly ignored, so acceptance must not be sloppy. Then, what are the precautions for acceptance ? The following Xiaobian recommends five major considerations for your reference.

What are the considerations for acceptance?

1. What are the precautions for acceptance? The general acceptance criteria are divided into two types of housing, one is rough housing, it is easier for the rough room to see the problem, because it is exposed. When inspecting a house, first look at the facade and check if there are any problems with exterior wall tiles, paints, doors and corridors. Then check the interior doors and windows, walls, floors, kitchens and toilets waterproof, strong and weak electricity, exhaust, exhaust smoke, etc. If you have any questions, please communicate with the developers and let them solve them. It is worth noting that, when doing a water retention test, it must be stated in advance with the neighbors downstairs, and the existence of water leakage should be observed after 24 hours.

2. What are the considerations for acceptance of the room? The second is the acceptance of the hardcover room. The acceptance of this type of room requires special care, because some hidden work defects may be covered by the hardcover room. When inspecting the house, special attention must be paid to the details, such as the quality of the decoration, the brand of the decoration materials, and, if necessary, the professional house inspector to accompany the inspection.

3. Acceptance of the wall will be relatively easy when it comes to acceptance. If it is winter when it is accepted, it would be better. Because the dry weather in winter can cause cracks in some walls with poor construction quality, but in addition to observation of cracks. Also use a ruler to check whether the wall is smooth and straight, but also use a rubber hammer to knock the wall, you can hear the sound to see if the wall is empty or not. In some places, you need to use a pen to mark, and then find the developer to deal with .

4. In the inspection of the house, the acceptance of the ground can not be observed with the naked eye is flat, so the error will be very large. The ground should be inspected with a ruler or a ruler, so that the detection error will not be so great. If there is a problem, we must make a mark and wait for a professional to retest.

5. When testing the window of a hardcover house, it is better to pick a strong wind and rainy day to detect it, because it can well check the sealing performance of the window, and can also check the sound insulation effect by opening and closing the window. However, for the rough room, because windows have not yet been made, it is necessary to check whether the door hole is of a standard. If it is not standard, installing the windows and doors later will be very troublesome.

The article concludes: What are the precautions for acceptance ? The above Xiaobian describes the five aspects of detection techniques, we must keep in mind. Since there are two types of housing acceptance, one is a rough room and the other is a hardcover room. When the two types of units are inspected, some testing standards are not the same. We should pay attention to distinguishing them.

GMP Room Material

Purification Plate Processing,Clean Room Color Steel Plate,Food Coloured Steel Plate,Process Sandwich Plate

Jiangmen Leonard Industrial Machineries Co., Ltd. , https://www.lndcleanroom.com

This entry was posted in on