What are the specifications and requirements for standard swimming pool construction?

In the hot summer, everyone likes to swim in the pool to play, play, and cool down, but with the development of the times, the swimming pool is getting more and more people's favorite.
China Hardware Business Network

In the hot summer, everyone likes to swim in the pool to play, play, and cool down, but with the development of the times, the swimming pool is getting more and more people's favorite.

The standard swimming pool is 50 meters long and 21 meters wide, and there is a semi-standard pool of 25*21 meters with a water depth of more than 1.8 meters. There are 8 lanes, each with a width of 2.5 meters and an additional 0.5 meters. The starting block should be centered on the centerline of each lane, with a table top 50 cm x 50 cm. Taiwan facing the front of the water

Above the water surface 50 to 70 cm, the countertop should not exceed 10 degrees above the water surface. The pool width of the swimming pool is generally not less than 5 meters from the starting end, and the remaining pool shore is not less than 3 meters. Official game pool

The width is not less than 10 meters, and the other shore width is not less than 5 meters. There is also a 25-meter swimming pool competition internationally.

(1) The length of the pool is generally 50m, and the tolerance is +0.03m. The electric shock panel timer can be installed at the pool end. (The size of the electric shock board is 2.4m×0.9m×0.01m, and it is placed at 30cm on the water surface of the water pool at both ends.

Immerse in water 60cm. The surface of the board is brightly colored and marked with the same marking line as the wall marking. The total length of the pool is 50m, the length of the short pool is 25m, the total length of the short pool is 25m, and the allowable error is +0.02m. Two

The wall of the end tank must meet this requirement from 30cm on the water surface to 80cm under the water.

(2) The pool is 21m wide and the Olympic World Championship requires 25m.

(3) Water depth requirement is ≥1.8m. The rest platform can be placed on the wall of the pool no more than 1.2m deep from the water surface, and the table top is 10~15cm wide.

(4) Each lane of the competition is 2.5m wide and 0.5m is added to the side lane. There is a lane line between the two lanes. The lane line is hung on both ends of the pool wall with a buoy line. And the end of the pool should have a lane center

Line, dark marking line.

(5) The starting platform should be centered on the center line of each lane, with a table top 50cm×50cm. The front edge of the water facing the water should be 50~70cm above the water surface. The countertop should not exceed 10" and guarantee the athletes

When starting, you can grab the table top in front and on both sides. The starting platform should be equipped with a backstroke handshake that does not protrude outside the pool wall. It is 30~60cm above the water surface and has two levels, horizontal and vertical. There should be a marked lane around the starting block

The number of numbers, which are arranged from right to left from the starting direction.

(6) The swimming pool needs to install an overflow tank on both side walls to try and keep the surface floating dirt away from the requirements of the pool water. The climbing ladder of the swimming pool should be embedded in the pool, the number is generally 4~6, and its position should not be affected.

Referee work.

(7) The pool wall must be vertically flat, the bottom of the pool is non-slip, and the surface of the pool is smooth and easy to clean. Generally, the wall is white Marseille, the bottom of the pool is covered with white glazed tiles, and the lane markings are black glazed tiles.

(8) The pool width of the swimming pool is generally ≥5m from the starting platform, and the remaining pool is ≥3m. Official competition pool, the shore width of the starting platform is ≥10m, and the other shore width is ≥5m

Swimming pool water circulation purification and disinfection system
First, the swimming pool management unit should set up a person responsible for the management of the circulating purification water supply system to ensure the normal operation of the system.
Second, do a good job of daily purification, disinfection, water cycle records.
3. Check the residual chlorine, PH value, water temperature, etc. of the dipstick disinfection pool and swimming pool water before each opening, and publicize the self-test results in a conspicuous position.
Fourth, to ensure that the swimming pool water should be purified once within 8 hours, and regularly add new water.
5. Ensure that the circulating water supply system is a facility that automatically adds disinfectants.
The dosage of chlorine is determined by temperature, water quality, water temperature and residual chlorine. It is generally designed according to 3-5MG/L. Chlorine should generally be vacuumed and chlorinated, and automatically added to the filtered water supply pipe. Pump connection

Lock control.


Http://news.chinawj.com.cn What are the specifications and requirements for standard swimming pool construction? Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn What are the specifications and requirements for standard swimming pool construction?

Basic Dyes

Cationic Dyes,Basic Red 14,Basic Yellow 28,Cationic Blue Sd-Bl

ZHEJIANG E-DYE SUPPLY CHAIN MANAGEMENT CO.,LTD. , https://www.easytodyes.com

This entry was posted in on